top of page
QSG webpage hero.png

Power House

Assembly Guide

MicrosoftTeams-image (1)_edited (1).png

Main Body

x1

USB Hub/Power Supply

x1

Block 2_2.png

USB Hub + Power Supply

x1

MicrosoftTeams-image (4).png

Double-Sided Tape

x1

Block 2_4.png

Screw-On Feet

x4

Block 2_5.png

What's Included

What's Not Included

Block 3_Subheadline Icon (1)_edited.png

Flat-Head Screwdriver

Assembly Steps

1

Adhere the Double-Sided Tape to the USB Hub.

Block3_1 (1).png

2

Press the USB Hub to the interior face of the Main Body.

Block 3_2 (1).png

3

Plug in each charging cradle into the USB Hub.

Block 3_3.png

Note: The USB Hub needs to be oriented top-down with ports facing up.

Block 3_2 note image.png

4

Secure the Power Supply chord using the Cable Strain Relief Clamp as shown.

Block 3_4.png

Note: Charging cradles may be plugged into the USB Hub in any order. Power is being supplied equally to each port.

5

Slide the Main Body onto the Back Plate and tighten the Screw-On Feet with a Flat-Head Screwdriver.

Block 3_5.png

Optional: If mounting the Power House, attach the Back Plate to a suitable wall structure with appropriate hanging hardware before sliding on the Main Body.

Block 3_5 note image.png

Plug in and check to see that each cradle is receiving power (indicated by red LED light).

Finished!

Note: The Power House is designed for indoor use and installation only. Clean as needed with isopropyl alcohol wipes. Do not use bleach.

Need more help?
bottom of page