top of page
integrations-header.jpg
QSG webpage hero.png

Power House

Assembly Guide (English)

What’s Included

Main Body

MicrosoftTeams-image (1)_edited.png
x1

USB Hub + Power Supply

Block 2_2.png
x1

Back Plate

MicrosoftTeams-image.png
x1

Double-Sided Tape Strip

Block 2_4.png
x1

Screw-On Feet

Block 2_5.png
x4

What You Need

Flat-Head Screwdriver

Block 3_Subheadline Icon.png

Assembly Steps

Block3_1.png
1

Apply the Double-Sided Tape Strip to the USB Hub.

Block 3_2.png
2

Adhere the USB Hub to the interior face of the Main Body.

Note: The USB Hub needs to be oriented top-down with ports facing up.

Block 3_2 note image.png
Block 3_3.png
3

Plug in each charging cradle into the USB Hub.

Block 3_4.png
4

Secure the Power Supply chord using the Cable Strain Relief Clamp as shown.

Note: Charging cradles may be plugged into the USB Hub in any order. Power is being supplied equally to each port.

Block 3_5.png
5

Slide the Main Body onto the Back Plate and tighten the Screw-On Feet with a Flat-Head Screwdriver

Optional: If mounting the Power House, attach the Back Plate to a suitable wall structure with appropriate hanging hardware before sliding on the Main Body

Block 3_5 note image.png

Finished

Plug in and check to see that each cradle is receiving power
(indicated by red LED light).

Note: The Power House is designed for indoor use and installation only.
Clean as needed with isopropyl alcohol wipes. Do not use bleach.

Need more help?

bottom of page